(Master and) Sub Plan History Source
RETURN TO: History Source
Set the History Source by Sub plan
Click History > Sub Plan History Source from the side navigation menu to apply a Master Plan as the History Source by sub plan. Choose or retain one of the three options:
- Import from Existing Plan – Also select Company, Establishment, and Plan from the drop-downs, which display only Master Plans as potential sources.
- Start Point Analysis
- Manual Input
Match Master Plan to Sub plan(s)
Select whether to have sub plans match the History Source by:- Plan Code
OR
- Establishment
- By default, if the system does not locate a match, Manual Input will be required for each sub plan. To change this default,
Assign Settings to Sub Plans
Expand the Sub Plans menu in the lower portion of the page.Check off one or more sub plans, and click [Assign].
Quick Tip: If the setting applies to all sub plans, click the link at the top of the list to Select: All.
If Manual Input is selected in the Master Plan: Enter values into each sub plan to obtain accurate Goals and Adverse Impact reporting.